Sophisticated crude oil lines
Preconditions for the step-by-step program for the rejection of oil transportation by truck were increased risks and operational expenditures, increased fuel and lubricant prices, and the short service life of vehicles
Learn moreUsing state-of-the-art technologies for oil production intensification
In July 2017, well No. 16G of Yakshur-Bodinskoye field with a flow rate of 56 tons per day was put into operation.
Learn moreDrilling of horizontal wells
In 17 out of 28 horizontal wells, multistage hydraulic fracturing (MSHF) with proppant agent was performed, acid MSHF was performed in 6 wells
Learn moreExploration at Dengizskoye and Verbovskoye license blocks
Neftisa company specialists analyzed available G&G data. The decision was taken to carry out an informative seismic survey using the 3D technique.
Learn moreExploration at Vareyagskoye field
The presence of reserves at the Vareyagskoye oil field was successfully forecast using a new approach for identifying low-amplitude structural culminations.
Learn moreSee also